Skip to content
FSMW
Insane Swim Dredge: the floating gold dredge of timber and steel on a lake, the bucket line on the right, wooded hills behind

Workshop

How our FS25 mods come together: from the first block in Blender to the first test in game. Not tidied up, but honest.

This is where the in-between states end up that usually only Tommy, Dredd and Percy get to see. Each machine shows its build phases in the order they happened, newest machine on top. Click any shot to enlarge it.

01 · 16 build shots

FSMW Emperor 9000

Our combine with an articulated grain trailer: from the first Blender pass through ten rounds of fixes to the header and the first test in FS25. Still in the works, but the block turned into a harvester a while ago.

To the mod page
  1. Pass 1 · side
  2. Pass 1 · front quarter
  3. Pass 2 · round 1 · side
  4. Round 2 · front quarter
  5. Round 5 · tracks
  6. Round 6 · front quarter
  7. Round 7 · side
  8. Pass 2 · front quarter
  9. Pass 2 · rear quarter
  10. Pass 2 · articulation from above
  11. Round 9 · cockpit
  12. Round 10 · cab interior
  13. Solo · without trailer
  14. Header · round 1
  15. Header · on the combine
  16. First test in FS25

02 · 13 build shots

FSMW Baron 250

The half-track tractor with front loader and the Steward trailer: render, test in FS25, fix, test again. Until the track runs smooth.

To the mod page
  1. First state
  2. With front loader
  3. Steward trailer
  4. Front loader on the Baron
  5. Front three-point hitch
  6. Swivel head · blade at 30 degrees
  7. Front loader · arm raised
  8. Rubber track with fender
  9. Driver's view
  10. Front loader coupled
  11. Baron with Steward
  12. In FS25 · with snow blade
  13. In FS25 · with front loader

03 · 12 build shots

FSMW Monarch 900

The mining truck with crane and the Squire tipper: first renders, release in FS25, then crane, console and driver's view for the update.

To the mod page
  1. First render
  2. First render · side
  3. Crane unfolded
  4. With the Squire tipper
  5. Crane with gold bar pallet
  6. Front with hood ornament
  7. Rear with couplings
  8. Release · in FS25
  9. Release · interior
  10. Update · crane
  11. Update · crane console
  12. Update · driver's view

04 · 7 build shots

Insane Swim Dredge

The floating gold dredge in variant A “Yukon”: our own Blender renders from the bow to the engine room, then the first shots from FS25.

To the mod page
  1. Variant A “Yukon” · overview
  2. Bow gantry and bucket chain
  3. Cutaway of the processing line
  4. Engine room
  5. Loading deck with gold bars
  6. In FS25 · bucket chain
  7. In FS25 · bow

05 · 12 build shots

Manitowoc 4600 Dragline

The dragline: from the first bucket of material through version 0.1.4.1 to the rebuild in factory dimensions from version 0.2.

To the mod page
  1. First material in the bucket
  2. First state
  3. Version 0.1.4.1 · from above
  4. Version 0.1.4.1 · whole machine
  5. Walkways and ladders
  6. Walk-in engine room
  7. 80s-style cab
  8. Dealer colours
  9. Version 0.2 · from above
  10. Version 0.2 · mast
  11. Test build 0.2.0.1 in FS25
  12. In FS25 · black and yellow

What goes on the workbench next is on the roadmap. To the roadmap